Kuybyshev Dam (Zhiguli HPP)
Concrete Gravity / Earth-fill dam · Samara Oblast, Russia
Kuybyshev Dam (Zhiguli HPP) is a concrete gravity / earth-fill dam on the Volga in Samara Oblast, Russia, standing 52 m (171 ft) high and completed in 1957. It carries an installed hydroelectric capacity of 2,488 MW. The structure impounds Samara Reservoir, about 5,757 km² on the map.
The Zhiguli Hydroelectric Station or Zhigulyovskaya Hydroelectric Station (Russian: Жигулёвская ГЭС, romanized: Zhigulyovskaya GES), formerly known as Kuybyshev Hydroelectric Station (Kuybyshev GES) is a large dam and hydroelectric station on the Volga River, located near Zhigulyovsk and Tolyatti in Samara Oblast of Russia. It is the sixth stage of the Volga-Kama Cascade of dams, and the second largest of them by installed power generating capacity.
Adapted from Wikipedia: Zhiguli Hydroelectric Station (CC BY-SA 4.0).
- Dam type
- Concrete Gravity / Earth-fill
- Structural height
- 52 m (171 ft)
- Installed capacity
- 2,488 MW
- Impounded river
- Volga
- Reservoir
- Samara Reservoir
- Location
- Samara Oblast, Russia
- Year completed
- 1957
- Height rank
- #86 of 115 indexed
- Output rank
- #25 of 102 indexed
- Coordinates
- 53.4266°, 49.4793°
Notable: Impounds Europe's largest reservoir by surface area (6,450 km²).
Among the 115 dams indexed in YearMaps, Kuybyshev Dam (Zhiguli HPP) ranks #86 by structural height, behind Jinping-I Dam (305 m). By installed generating capacity it ranks #25, behind Three Gorges Dam (22,500 MW).
Impounded reservoir: Samara Reservoir (5,757 km², impounded 1955).
Nearest cities: Tolyatti (7 km), Novokuybishevsk (45 km), Samara (51 km).
More about Kuybyshev Dam (Zhiguli HPP)
History
The idea of hydroelectric station on the Volga near Samara Bend was proposed by Gleb Krzhizhanovsky in 1910. Ten years later K. V. Bogoyavlensky proposed a hydroelectric station near Perevoloki, utilizing naturally existing water level difference. The disrupted economic system of the time did not allow this project to be realized.
In the early 1930s the Volga near Samara Bend and Yaroslavl was surveyed, and some dam projects were proposed. In 1937 the project of a dam near the villages of Perevoloki and Krasnaya Glinka was approved. Forced labour from Kuybyshev Camp was used (up to 40,000 people). In the autumn of 1940, oil fields were found near the construction site, causing a halt in construction.
Sections adapted from Wikipedia: Zhiguli Hydroelectric Station (CC BY-SA 4.0).
Kuybyshev Dam (Zhiguli HPP): Key Facts
| Crest length | 2,800 m |
|---|
Facts from Wikidata Q1965688 (CC0).